Rehabilitation of Highway 62 West, Crater Lake National Park, Klamath County, Oregon
ALTERNATIVES
ALTERNATIVE B: RESURFACING, RESTORATION, AND REHABILITATION
Switchbacks
The road segment from milepost 71.1 to milepost 71.5 contains two switchbacks. In this alternative, the roadway would be resurfaced and rehabilitated, and widened to the greatest extent possible within the existing alignment to assist with wider tracking vehicles. The road would remain in the existing alignment and within the previously disturbed area.
FIGURE 4. WHITEHORSE CROSSING PROPOSED PROFILE REDUCTION [NPS-DSC\OCT02\106\20134]
***previous*** — ***next***