2003 Revised Admin History – Chapter Seventeen Planning and Development at Rim Village 1886-Present

Although the lodge had its sewage system reworked as a result of the contamination, emergency funds were not extended to cover projects in the master plan. The abandonment of the septic tank and leachfield system serving the cafeteria and cold water cabins was not accomplished. [87] The contamination had other ramifications. The Rim Campground was converted to a picnic area in the summer of 1976. In the midst of litigation arising from his role in the water contamination, Peyton sold the concession on March 1, 1976, to the Canteen Company of Oregon. Canteen was to assume the remainder of the 30 year contract. [88]

General management plans began to replace master plans in the national parks during 1977. This was in response to congressional pressure to improve administration of NPS holdings and would include public comment in park planning. The new document was done in advance of legislation mandating GMPs and consisted of a statement for management, a resource management plan, a visitor use plan, a general development plan, and subsidiary plans. [90] Accompanied by an environmental assessment, the draft GMP for Crater Lake was issued for public comment in July 1977.

Within the general development plan was a development concept for Rim Village that was very similar to what had been proposed in the 1967 master plan. The differences were that the lodge was now to be maintained as a first class accommodation, with refurnishing and maintenance to be done in a way that its historic character would be retained. The proposed visitor center was to be placed just north of the existing comfort station on the plaza. It was to be surrounded by “restored green space”, while the roadway was to be moved south to provide access to the lodge. The plan stated that the key to implementing a Rim Village plan was the removal of the rental cabins so that parking on the existing roadway and plaza could be relocated.90 Another major difference to the 1967 plan was that rim redevelopment was not tied to moving park headquarters to the south entrance, though the plan attempted to make a case for the move.

The development concept had a long-range goal of restoring the rim of the caldera to an interpretive zone, stating that those facilities not directly related to the viewing experience and interpretation could be removed upon the termination of their useful life. [91] No timetable was given for the proposed actions, but the development concept maintained that the replacement of lodging units with others elsewhere in the park would depend on prevailing conditions at that time and the availability of facilities within nearby communities. It did specify, however, that prior to any major actions at Rim Village, a comprehensive design would be prepared that would determine the location of the interpretive center, pedestrian areas, parking, and access roads. [92] In December 1977, the NPS issued a final GMP with an environmental assessment. The latter was the subject of some controversy in the public comment period because a conservation wanted the NPS to do an environmental impact statement. Klamath Falls Group Superintendent Ernest Borgman dismissed the idea by equating the depth and utility of an EA with an EIS while characterizing the latter as involving unnecessary delays. [93]

G. False Starts and Potential Resolution: 1978-1988

At Rim Village, the GMP may have created more problems than it solved. Its cursory treatment of the Crater Lake Lodge was one reason why the NPS eventually found itself entangled with provisions of the National Historic Preservation Act. The agency’s proposed resolution of the redevelopment problem was politically expedient and was aimed at using the support for a rehabilitated lodge to construct a visitor center within a new hotel. In doing this, however, the NPS committed itself to a multi-million dollar effort that was dependent upon at least ten years of discretionary Congressional funding for special construction projects.