Popenoe, James H. Soils of the M-2-1-1, M-3-1-2, M-4-1 and beginning of M-3 and M-4 roads, Bridge Ridge and Bridge Creek headwaters [watershed rehabilitation units]. 1985.
Popenoe, James H. Soils of the M-7-5 and 1800 roads, east slope of Bridge Ridge [watershed rehabilitation unit]. 1985.
Popenoe, James H. Watershed rehabilitation and revegetation in Redwood National Park. 1991.
Popenoe, James H., Jack Lewis, and Donna C. Marron. Soil survey of L-1 and L-1-5 roads for watershed rehabilitation, Redwood National Park [rehabilitation unit 82-4]. no date.
Popenoe, James H., Mark J. Alpert, and Nancy K. Sturhan. Soils of the 1840 and 1850 roads, east slope of Bridge Ridge [watershed rehabilitation unit 84-4: unit pre-review draft]. 1984.
Popenoe, James H., and Ken A. Bevis. Soils of the upper Elam Creek tributary watershed. 1990.
Popenoe, James H., and Mark J. Alpert. Soils of the 1800, 1820, and 1821 roads, east slope of Bridge Ridge [watershed rehabilitation unit 84-3: unit pre-review draft]. 1984.
Popenoe, James H., and Nancy K. Sturhan. Soils of the lower K&K Road watershed rehabilitation unit. 1988.
Popenoe, James H., and Roy W. Martin. Soils of the Fortyfour Creek tributary watershed rehabilitation unit [84-5]. 1984.
Popenoe, James H., and Roy W. Martin. Soils of the M-6 Road, Bridge Creek watershed rehabilitation unit. 1985.
Popenoe, James H., and Roy W. Martin. Soils of the M-7 Road at the Bridge Creek crossing [watershed rehabilitation unit 86-1]. 1985.
Popenoe, James P. “Watershed rehabilitation and revegetation in Redwood National Park.” Proceedings of the USDI-National Park Service Reclamation and Vegetation Workshop,, none. National Park Service, United States Department of the Interior, 1991.
Popenoe, James P. Soils of the Highway 101 Bypass watershed rehabilitation unit (88-1). 1988.
Popenoe, James P., Jack Lewis, Nancy K. Sturhan, and Roy W. Martin. Site-specific soil inventories from watershed rehabilitation sites in the lower Redwood Creek basin, Redwood National Park. 1980.
Popenoe, James P., and Nancy K. Sturhan. Soils of the May Creek headwaters watershed rehabilitation unit (87-1). 1987.
Potter, Robert G. Rehabilitating the Redwood Creek watershed: a preliminary plan prepared for the California Resources Agency by a multidisciplinary study team. 1975.
Proceedings of a symposium on watershed rehabilitation in Redwood National Park and other Pacific Coastal areas, Humboldt State University, Arcata, California, August 24-28, 1981, Robert N. Coats. John Muir Institute, Center for Natural Resource Studies/U.S. National Park Service, 1981.
Proceedings of a workshop on techniques of rehabilitation and erosion control in recently roaded and logged watersheds, with emphasis to north coastal California,March 13-14, 1978, Harvey M. Kelsey, and Mary Ann Madej. Arcata, CA: Resources Management Division, Redwood National Park, National Park Service, 1978.
Redwood National Park, and Denver Service Center. Watershed rehabilitation plan, Redwood National Park. Denver, CO: National Park Service, Denver Service Center, 1981. NPS 1746.
Redwood National Park. Field trip guide to observe watershed rehabilitation and geomorphic studies in Redwood National Park. 1985.